Tuesday, 30 January 2018

BACK TO BROADVISION                                          

PERIODICAL     RETURNS      WITH      DUE      DATES                      

All reports shall be sent only on google forms or email only

Report   No.

Description Of Report

Response

Due Date

1

UPDATED LIST OF ENGINEERING HEADS OF AIR STATIONS

VIEW


2

MONTHLY TECHNICAL REPORT

 

 

 


VIEW

2ND OF EVERY MONTH

3

REPORT ON THE WORKING OF 100W FM TX

OLD REPORTS

VIEW

5TH OF EVERY MONTH

4

REPORT ON THE TRANSMISSION OF SPECIAL BROADCAST i.e  MANN KI BAAT etc.

VIEW

IMMEDIATE


AFTER EVERY SPECIAL BROADCAST

5




6

REPORT ON UTILISATON OF NETIA SYSTEM


5TH OF EVERY MONTH

7

BREAKDOWN DETAIL REPORTS

VIEW

IMMEDIATE

8

INCUMBENCY GAZETTED ENGG. STAFF

VIEW

5TH OF EVERY MONTH

9

DETAILS OF GAZETTED ENGG. STAFF

VIEW

DATA CHANGE  TO BE UPDATED

11

V.S.D ANALYSIS


15 JAN,

15 APRIL,

15 JULY,

15 OCT.

12

FOREIGN EXCHANGE REQUIREMENT


15-Mar



15 SEPT.

13

FIRE FIGHTING EQUIPMENT


15-Jun

15-Dec

14

MEASUREMENT OF STL


15-May

15 NOV.

15

ANNUAL ADMINISTATIVE REPORT(ENGG.)


15-May

16

MAJOR SPARES


15-Mar

17

ELECTRICAL INSTALLATION


15 FEB.

18

EARTH RESISTANCE


15 FEB.

19

MEASUREMENTS OF EQUIPMENTS   OTHER THAN PLAYBACK


15 SEPT.

20

WATER POTABILITY


15-Aug

21

TRANSFORMER OIL TESTING


15-Mar

22

MEASUREMENTS OF PLAYBACK   EQUIPMENTS


15 SEPT.

23

ANNUAL BREAKDOWN REPORT

VIEW

15-Apr

24

SURPLUS EQUIPMENT


15-Jun

25

ANNUAL PHYSICAL VERIFICATION OF STORES


30-Apr

29

ANNUAL UTILISATION REPORT OF RECORDING & PLAYBACK EQUIPMENT


15 SEPT.

29

ANNUAL AVAILABILITY REPORT   ON PLAYBACK AND RECORDING EQUIPMENTS LIKE  CD PLAYERS, HDBRS etc.


15 SEPT.

FORMS FOR REPORTS TO DIRECTORATE

Reports can be submitted through Forms and the response submitted can be viewed using the links provided below:

S. no

ONLINE FORMS reg-Information sought by the Directorate

RESPONSE

Circular ref no. and

Due Date

1

Report on Sub-optimal operation of Transmitters

VIEW

immediate

2

Details of New Studio Equipments installed in the AIR Stations of WZ

VIEW

11.07.2016

3

Information regarding newly installed Transmitters at AIR Stations in WZ

VIEW

08.07.2016

4

 Availability of AC Plants at AIR Studios and Transmitters

VIEW

immediate

5

Availability of DG Sets at AIR Studios and Transmitters

VIEW

immediate

6

Availabilityof Old Transmitters and major spares at AIR Stations in the WZ

VIEW

immediate

7

REQUIREMENTS FOR RE 2020-21 and BE 2021-22

VIEW

immediate

8

Availability of Measuring and Monitoring Equipment

VIEW


9

Digitization of AIR Land Resources

VIEW

VIEW Circular dated 31-01-2017

10

Technical /Equipment Audit

VIEW

VIEW Circular dated 31-01-2017

11

Information regarding Defunct Transmitter, Mast, AC Plant, DG Sets

VIEW

VIEW Circular date 02/03/2017

12

Special Minor Works proposal for AIR Stations of the West Zone for 2020-21

VIEW


13

Status report on newly installed NAUTEL and HARRIS make DX25 MW Transmitters at AIR   Stations of WZ

VIEW

VIEW Circular

14

Pending Civil/ Electrical works yet to be taken up by CCW under Special  Minor  Works

VIEW

VIEW Circular dated 12-05-2017

15

Leave Records of Group A and B Engineering Officers who have completed 50 years of age or 30 years of Service

VIEW IS NOT AVAILABLE

VIEW Circular

16

Status of pre 1985 AIR Buildings and proposals for their renovation for 2017-18

VIEW

VIEW CIRCULAR

17

Monitoring of attendance of Officers of the level of US/equivalent and above for June, 2017 reg

VIEW IS NOT AVAILABLE

VIEW CIRCULAR

18

Details of Expenditure on DRM Transmitters at AIR Stations in West Zone

VIEW

VIEW CIRCULAR

19

Number of Vehicles in position in AIR Stations in West Zone

VIEW

CIRCULAR

20

Non utilisation of Studio Equipment and facilities in AIR Station of West Zone

VIEW

CIRCULAR

21

Routine annual maintenance charges and comprehensive maintenance charges of AIR FM Towers of the West Zone

VIEW

CIRCULAR

22

Status of Staff Quarters

VIEW

CIRCULAR

23

Grant of Non Functional Grade upgradation in Grade Pay of Rs. 5400 in PB 2 to eligible AE's posted in AIR Stations of WZ

VIEW

CIRCULAR

24

Information regarding number of vacancies of AE's available for the year 2006-2007

VIEW

CIRCULAR

25

Compiled statement on renewal of lease deeds of AIR Lands

VIEW

CIRCULAR

26

Data on List of Staff Quarters of AIR as on 29.09.2017

VIEW

CIRCULAR

27

Procurement of spares for 1 KW, 5 KW, 6 KW, 10 KW (RVR nmake) FM Transmitters in AIR Network-WZ

VIEW

CIRCULAR

28

Data of DRM Transmitters in AIR Network-WZ

VIEW

CIRCULAR

29

Details of IT infrastructure in AIR & DD network

VIEW

CIRCULAR

30

STATUS OF MW AND SW TRANSMITTERS AT AIR STATIONS

VIEW

CIRCULAR

31

ACTION TAKEN ON SWACHHTA PAKHWADA BY AIR STATIONS

VIEW

CIRCULAR

32

Providing details of Service contracts of DD and AIR

VIEW

CIRCULAR

33

Special Minor Works proposal for AIR Stations of the West Zone under AIR/IEBR/NP/ARCA 2022-23 funds.

VIEW

IMMEDIATE

34

Details of RC land

VIEW

CIRCULAR

35

Liabilities in respect of Power Supply Charges, Minor Works(routine) and METP (routine) of AIR Stations of the West Zone 

VIEW


36

Incurring expenditure  under sub head Minor Works(routine) and METP (routine) of AIR Stations of West Zone

VIEW


37

Operation of AIR/ DD installation co-sited at AIR/DD site

VIEW


38

Availability and working of UPS at FM Transmitters

VIEW


39

Requirements of any equipment available at VLPTV/LPTVs which have been closed  

VIEW


40

Details of estts. of Min I&B

VIEW


41

Power Supply connection for AIR residential Staff quarters

 VIEW




 

42 

 Details of security guards at AIR Stations

 VIEW


43

Details of work and purchases under METP(Routine) and MW (Routine) of  AIR Stations

VIEW


44

Details of Minor  and Major Gear Breakdowns at MW, SW and FM Transmitters of AIR Stations

VIEW


45 

 Present Utilisation of NETIA software

 VIEW


46 

 Details of Digital Audio Workstation available at AIR Stations

 VIEW


47 

 Reassessment of Power Supply Load at AIR Stations

 VIEW


48

STUDER Make Studio Consoles and Digital cabling at AIR Stations

VIEW


49

Additional requirement of funds under METP(Routine) and MW (Routine) of AIR Stations

VIEW


50

Status of works sanctioned by O/o. ADG(E)(WZ) under ARCA/IEBR MINOR WORKS (Responses)

VIEW


51

Report on the working of Web based Telemetry

VIEW


52

Regarding physical health status of FM towers for infra sharing in Phase-III

VIEW


53

Analysis of Contracted Electrical Load & Electrical Energy consumption of Setups of PB


From PB Budget Dn.

54

Report on the DRM Transmitters broadcasting in Simulcast and Full DRM mode

VIEW


55

Review the implementation of decision of rationalisation of security

VIEW

The data requirements for filling the form

56

Availability of C Band RNT and Accessories

VIEW


57

Procurement of Spares for DB make   FM Transmitter

VIEW


58

Utilisation of NETIA System for VBS Duty Room Automation

VIEW


59

Quarterly Satisfactory Service Certificate for AMC of HP Hardware with M/s HP Enterprise

 

VIEW


60

Separate Budget provisions for tour and transfer TA under DTE- RE 2018-19 and BE 2019-20

VIEW


61

Report on the working of Innovaction make FM Transmitter installed in the West Zone

VIEW


62

Studio Utilisation Report of AIR Stations of West Zone

VIEW


63

Running of FM Transmitter in Mono Mode

VIEW


64

 Proposal for reduction of Power Supply Sanctioned load / Contracted load at AIR Stations

VIEW


65

Status of theft cases occurred at AIR Stations after withdrawal of Security-reg.

VIEW


66

Special METP proposals for AIR Stations of the West Zone under IEBR 2022-23 under H/A AIR/IEBR/NP/ARCA 2022-23 funds

VIEW

IMMEDIATE

67

Details of PAO an DDO of Stations under West Zone (E)

VIEW


          68

REQUIREMENTS FOR AIR NETWORK UNDER PLAN 2020-2023

VIEW


69

Information required for submitting information to Income Tax Department in respect of AIR Stations 

VIEW


70

Status of Faulty equipments in Captive Earth Station at AIR Stations

VIEW


71

Utilisation of NETIA system for Radio News Unit activities

VIEW

DUE DATE 

06.06.2019

72

 Details of IB(E)S Officers for SPARROW Account


IMMEDIATE

73

Status of Studio Transmitter Link Moseley make -reg

VIEW


74

Information about Mast of MW and SW AIR Stations of WZ

VIEW


75

Information on Transmission timings at Transmitters

VIEW


76

Transmitter wise Reception quality details of AIR Stations in West Zone

VIEW


77

Detail for Promotion of employment for Disabled persons at AIR Stations of WZ

VIEW


78

Procurement of spares for R and S FM Transmitter

VIEW


79

Procurement of Spares for INNOVACTION make FM Transmitter.

VIEW


80

Procurement of Spares for HARRIS make FM Transmitter

VIEW


81

Requirement of funds for 100W FM Transmitters

VIEW


82

AGENDA FOR CONFERENCE OF PROG AND ENGG. HEADS OF AIR STATIONS IN NEW DELHI

VIEW


83

Availability of IP Audio Codecs at AIR Stations of West 

Requirement of IP Codecs at AIR Stations

VIEW


84

1. COVID-19 PBS Instructions: Daily Status Report of AIR Stations of West Zone

 2. Add Corona warriors

VIEW

 

 VIEW


85

AIR stations details for security arrangement

VIEW


86

 

Broadcast on Social media by AIR Stations- Report

VIEW


87

REQUESTING ADDITION OF ITEMS ON CAS

Search information related to Item code, HSN codes, Budget and Accounting Heads


88

Details in respect of the station where grid connected solar PV system is proposed to be installed.

VIEW


89

Details of Free hold land with AIR Stations of WZ

VIEW


90

LIST OF EQUIPMENT RECEIVED FROM DTE/CENTRAL STORES/STORES TRANSFERS FROM OTHER STATIONS

VIEW

 

 

 91

 Details on Government’s compensation for Public Broadcaster Obligations of Prasar Bharati 

 VIEW

 

 92

 Reception Report for Open Mode Signal reception in IRD / STB receivers  [1330-1630 hrs]

  VIEW

 

 93

Transmitter wise Remote Monitoring status for AIR Stations in West Zone 

  VIEW

 

 94

 ANNUAL EXPENDITURE AIR MW & SW TRANSMITTERS 20-21

VIEW